Add Contractor Technical Staff in Dubai BPS

We rate this tip B tier: the Dubai Municipality error "All required staff has not been approved on this project" is cleared on a screen no menu names, Contractor Technical Staff, six clicks from the dashboard. The page shows each click, as captured on Nov 13, 2026.

We rate this tip B tier: it saves a contractor the hunt for one screen, and we cannot put a dirham figure on that. When Dubai Municipality's building permit system (Dubai BPS) refuses to open an inspection request with the red line "All required staff has not been approved on this project. Please assign all required staff and ensure it is approved.", the fix is on a screen called Contractor Technical Staff. It is not in the top menu, not under Construction Support Services' own menu and not on the page that shows the error: it is a small link in the right-hand column of the Periodical Inspection Process screen. The six clicks below were captured in a contractor's account on Nov 13, 2026. We think the message is the worst part of the problem, because it says what is missing and gives no link to where it is fixed.

Next: the block that holds up a Dubai sale after the service fees are paid, and how to lift it, the 5% municipality line on a DEWA bill that one online request can lower or what a tanker fill costs against the tap, with the sum.

The error, and where it appears

A Dubai BPS screen headed Select Permit with a red warning that all required staff has not been approved on this project, above a search form whose last field is Contractor Engineer
Dubai BPS's Select Permit screen with the red message that all required staff has not been approved on this project, above a search form for Permit No, Parcel ID, Community No, Permit Type, Building Type and Contractor Engineer Dubai Municipality

The message appears on the Select Permit screen, the first step of a request made on a building permit (here, a site inspection request). The form under it has a Contractor Engineer list that reads "Select Engineer". Our reading is that the list is filled from the staff assigned to the permit, so with nobody assigned and approved there is nobody to select and the request cannot start. Dubai BPS does not say this in words; the message is all it gives.

The rule behind it is in the municipality's own Circular No. (11-6-1) of 2021 (dated Aug 23, 2021, read Nov 13, 2026). It says the periodic inspection service applies to every project under construction that the municipality has licensed, "through appointment of the technical staff of the consultant and contractor", that the service is provided electronically through Dubai BPS, and that the consultant and the contractor answer for the results of not using the system, penalties included. So a permit with no approved contractor staff is not a glitch: the system is holding the project to the circular.

The six clicks

Sign in first at Dubai Municipality's dashboard, https://hub.dm.gov.ae/link/Dashboard, with the contracting company's account.

EASYMASE Civil Engineering's short BPS tutorial shows the sign-in and the way into the BPS working area: Login at the top right of the municipality's site, the consultant or contractor username and password, a one-time password by email, then Services and Apply Now on a building service, which opens the BPS page; if it does not, "click on working area in the top".

1. Dashboard: Building Services

Dubai Municipality's dashboard listing three site structural inspection requests, with Building Services outlined in red in the Quick Links column and a red label reading Step 1
Dubai Municipality's dashboard at hub.dm.gov.ae with three Request Site Structural Inspection entries and, in the Quick Links column on the right, Building Services outlined in red and labeled Step 1 Dubai Municipality

On the dashboard, look at the Quick Links column on the right: My Parcels, Inspection reports, Recycled water billing reports, Services, Building Services, My Payments. Choose Building Services, the fifth link. The plain Services link above it opens the general catalog and is the wrong one.

2. Other Services: Construction Support Services

A Dubai Municipality page headed Other Services with one card, Construction Support Services, and a red arrow labeled Step 2 pointing at its Apply Now button
The Building Services page with the heading Other Services and one card, Construction Support Services, whose Apply Now button is marked by a red arrow labeled Step 2 Dubai Municipality

Scroll down the Building Services page to the heading Other Services. It holds one card, Construction Support Services, described as permits, inspections and compliance. Press Apply Now. The button does not open a form: it signs you in to the older portal, portal.dm.gov.ae, where Dubai BPS lives.

3. Dubai BPS: Periodical Inspection Process

Dubai BPS's page Working Area, Services and Modules, with four service tiles; the first, Periodical Inspection Process, is outlined in red under a label reading Step 3
Dubai BPS's Working Area, Services and Modules, with a row of service tiles; the first tile, Periodical Inspection Process, is outlined in red and labeled Step 3 Dubai Municipality

You land on "Working Area - Services and Modules" with a row of tiles: Periodical Inspection Process, Temporary Electricity Supply for buildings before completion, Permits Deposit Refund, Request for Construction completion in case of dispute, and more below. Choose the first tile, Periodical Inspection Process. Nothing in the tile's name mentions staff; it is still the right one.

A Dubai BPS working area with My Tasks and Tracking tabs and a search form; in a right-hand column of Related Links, Contractor Technical Staff is outlined in red under a label reading Step 4
The Periodical Inspection Process working area with My Tasks and Tracking tabs and a search form; in the Related Links column on the right, the link Contractor Technical Staff is outlined in red and labeled Step 4 Dubai Municipality

The screen that opens shows My Tasks and Tracking with a search form. Ignore the form. On the right is a column headed Related Links: Working Procedure, Project Progress, Periodical Reports, Structural Report, Contractor Technical Staff, Consultant Technical Staff. Choose Contractor Technical Staff, the fifth. On a small window the column sits off to the right or below the fold, which is why it is easy to miss.

5. Search for the project

A window headed Contractor Technical Staff with search boxes for Project No, Permit No and Parcel ID, buttons Search, Add Staff and Edit Staff, an empty table of added contractor engineers, and Save and Close Window buttons
The Contractor Technical Staff window with a search form for Project No, Permit No and Parcel ID, the buttons Search, Add Staff and Edit Staff, an empty list of added contractor engineers, and Save and Close Window below Dubai Municipality

A separate window opens, so allow pop-ups for portal.dm.gov.ae if nothing happens. It has three search boxes: Project No, Permit No and Parcel ID. Fill in one of them (the permit number or the parcel ID from the building permit both work as a search key on the earlier screens) and press Search.

The same search by plot runs through the rest of BPS, as EASYMASE Civil Engineering's later tutorial shows on the working area page: type the plot number in the Parcel ID box, press Search, and the project appears below with its applications.

6. Add Staff, then Save

Press Add Staff, pick the company's engineer or engineers for the project, and press Save. The staff appear in the table "List of added contractor engineers", whose columns are Staff ID, Staff Name, Mobile No., Tel No., Email Id, Permit No, Role, Status, Rejection Reason, Receive Email, Receive SMS and Delete. Edit Staff changes an entry, and the Delete column removes one.

Two of those columns matter for the error. Status and Rejection Reason show that adding a person is a request, not the end of it, which matches the message's second half: "ensure it is approved". Go back to the inspection request only once Status shows the staff as approved; if a Rejection Reason appears instead, fix what it names and add the person again.

Before you add anyone

  • Use engineers the municipality already knows. The circular speaks of engineers "registered with the municipality", and the municipality's services list (read Nov 13, 2026) has a service of its own, Certificate of Accreditation of Engineering Staff, for registering in its Engineering Practice Register. An engineer who is not registered to the company there has nothing to be picked from in Add Staff.
  • The consultant has the same screen. Consultant Technical Staff is the next link in the same column. If the contractor's staff are approved and the error stays, the consultant's side of the permit is the next thing to check, since the circular names both.
  • It is per permit. The table has a Permit No column and the search is by project, permit or parcel, so staff approved on one permit do not carry to the company's next one.
  • The inspection itself costs nothing in the usual case. The same services list says of Request Site Structural Inspection that building contractors request it through the municipality's website or Dubai BPS, and that it is free if no re-demarcation is needed.

What we checked

The six screens are captures of Nov 13, 2026 from a contracting company's own account, with the company's name, its permit and parcel numbers and its request references blanked out; the red labels and arrows were added to them. Every menu name, link name, button and column on this page is read from those captures. The circular was read in full the same day in the municipality's English translation, which says the Arabic text prevails. The two service descriptions come from the municipality's services list as it stood that day.

What we could not check: the form behind Add Staff is not in the captures, so this page does not describe its fields. Nothing we could read says who approves the staff (the project's consultant or the municipality) or how long approval takes, and the circular is silent on both. The service detail pages on hub.dm.gov.ae load only in a signed-in browser session and were not read. Our reading that the Contractor Engineer list is filled from the approved staff is an inference from the two screens, not a statement by Dubai Municipality.

Sources

Moments

How to login and check Dubai BPS system | Dubai Municipality for Building permit.

EASYMASE CIVIL engg

  1. EASYMASE Civil Engineering's short BPS tutorial shows the sign-in and the way into the BPS working area: Login at the…

How to Apply for a Simple Modification | Dubai Municipality BPS Step by Step + All Application Types

EASYMASE CIVIL engg

  1. The same search by plot runs through the rest of BPS, as EASYMASE Civil Engineering's later tutorial shows on the…

Photos

A window headed Contractor Technical Staff with search boxes for Project No, Permit No and Parcel ID, buttons Search, Add Staff and Edit Staff, an empty table of added contractor engineers, and Save and Close Window buttonsA Dubai BPS working area with My Tasks and Tracking tabs and a search form; in a right-hand column of Related Links, Contractor Technical Staff is outlined in red under a label reading Step 4Dubai BPS's page Working Area, Services and Modules, with four service tiles; the first, Periodical Inspection Process, is outlined in red under a label reading Step 3A Dubai Municipality page headed Other Services with one card, Construction Support Services, and a red arrow labeled Step 2 pointing at its Apply Now buttonDubai Municipality's dashboard listing three site structural inspection requests, with Building Services outlined in red in the Quick Links column and a red label reading Step 1A Dubai BPS screen headed Select Permit with a red warning that all required staff has not been approved on this project, above a search form whose last field is Contractor Engineer

See also

About this page

Last updated Nov 22, 2026 by the Vi.ki team. Page text CC BY-SA 4.0.

Edit History

Hotkeys

/
Jump to the search box
? or Ctrl + /
Open this list
Esc
Close this list, the photo viewer, or the account menu

Video

Space or K
Play or pause
← →
Back or forward 5 seconds
J L
Back or forward 10 seconds
0 to 9
Go to 0% to 90% of the video
, .
Previous or next frame, while paused
M
Mute or unmute
C
Captions on or off
F
Full screen on or off
A D
Previous or next moment

Photo viewer

← → or A D
Previous or next photo
↑ ↓ or W S
Previous or next photo
Home End
First or last photo
I
Show or hide the photo's info
Z
Clickless on or off: a pointer over a thumbnail shows it
N
Compare with the last photo: back to the one shown before this, and N again comes back
Q
Move the thumbnails to the next edge: top, bottom, left and round
, or Ctrl + ,
Open or close the viewer's settings
V
Clickless pan: a zoomed photo follows the pointer, rather than being dragged
Shift
Browse on or off
B
Show or hide the button bar
T
Show or hide the thumbnails
1
100% zoom on or off
0
Rate the photo as no opinion; again takes the answer back
+ -
Rate the photo a step higher or lower
F
Full screen: the photo alone. F again puts everything back.
Back to top