Add Contractor Technical Staff in Dubai BPS
We rate this tip B tier: the Dubai Municipality error "All required staff has not been approved on this project" is cleared on a screen no menu names, Contractor Technical Staff, six clicks from the dashboard. The page shows each click, as captured on Nov 13, 2026.
We rate this tip B tier: it saves a contractor the hunt for one screen, and we cannot put a dirham figure on that. When Dubai Municipality's building permit system (Dubai BPS) refuses to open an inspection request with the red line "All required staff has not been approved on this project. Please assign all required staff and ensure it is approved.", the fix is on a screen called Contractor Technical Staff. It is not in the top menu, not under Construction Support Services' own menu and not on the page that shows the error: it is a small link in the right-hand column of the Periodical Inspection Process screen. The six clicks below were captured in a contractor's account on Nov 13, 2026. We think the message is the worst part of the problem, because it says what is missing and gives no link to where it is fixed.
Next: the block that holds up a Dubai sale after the service fees are paid, and how to lift it, the 5% municipality line on a DEWA bill that one online request can lower or what a tanker fill costs against the tap, with the sum.
The error, and where it appears
The message appears on the Select Permit screen, the first step of a request made on a building permit (here, a site inspection request). The form under it has a Contractor Engineer list that reads "Select Engineer". Our reading is that the list is filled from the staff assigned to the permit, so with nobody assigned and approved there is nobody to select and the request cannot start. Dubai BPS does not say this in words; the message is all it gives.
The rule behind it is in the municipality's own Circular No. (11-6-1) of 2021 (dated Aug 23, 2021, read Nov 13, 2026). It says the periodic inspection service applies to every project under construction that the municipality has licensed, "through appointment of the technical staff of the consultant and contractor", that the service is provided electronically through Dubai BPS, and that the consultant and the contractor answer for the results of not using the system, penalties included. So a permit with no approved contractor staff is not a glitch: the system is holding the project to the circular.
The six clicks
Sign in first at Dubai Municipality's dashboard, https://hub.dm.gov.ae/link/Dashboard, with the contracting company's account.
EASYMASE Civil Engineering's short BPS tutorial shows the sign-in and the way into the BPS working area: Login at the top right of the municipality's site, the consultant or contractor username and password, a one-time password by email, then Services and Apply Now on a building service, which opens the BPS page; if it does not, "click on working area in the top".
1. Dashboard: Building Services
On the dashboard, look at the Quick Links column on the right: My Parcels, Inspection reports, Recycled water billing reports, Services, Building Services, My Payments. Choose Building Services, the fifth link. The plain Services link above it opens the general catalog and is the wrong one.
2. Other Services: Construction Support Services
Scroll down the Building Services page to the heading Other Services. It holds one card, Construction Support Services, described as permits, inspections and compliance. Press Apply Now. The button does not open a form: it signs you in to the older portal, portal.dm.gov.ae, where Dubai BPS lives.
3. Dubai BPS: Periodical Inspection Process
You land on "Working Area - Services and Modules" with a row of tiles: Periodical Inspection Process, Temporary Electricity Supply for buildings before completion, Permits Deposit Refund, Request for Construction completion in case of dispute, and more below. Choose the first tile, Periodical Inspection Process. Nothing in the tile's name mentions staff; it is still the right one.
4. Related Links: Contractor Technical Staff
The screen that opens shows My Tasks and Tracking with a search form. Ignore the form. On the right is a column headed Related Links: Working Procedure, Project Progress, Periodical Reports, Structural Report, Contractor Technical Staff, Consultant Technical Staff. Choose Contractor Technical Staff, the fifth. On a small window the column sits off to the right or below the fold, which is why it is easy to miss.
5. Search for the project
A separate window opens, so allow pop-ups for portal.dm.gov.ae if nothing happens. It has three search boxes: Project No, Permit No and Parcel ID. Fill in one of them (the permit number or the parcel ID from the building permit both work as a search key on the earlier screens) and press Search.
The same search by plot runs through the rest of BPS, as EASYMASE Civil Engineering's later tutorial shows on the working area page: type the plot number in the Parcel ID box, press Search, and the project appears below with its applications.
6. Add Staff, then Save
Press Add Staff, pick the company's engineer or engineers for the project, and press Save. The staff appear in the table "List of added contractor engineers", whose columns are Staff ID, Staff Name, Mobile No., Tel No., Email Id, Permit No, Role, Status, Rejection Reason, Receive Email, Receive SMS and Delete. Edit Staff changes an entry, and the Delete column removes one.
Two of those columns matter for the error. Status and Rejection Reason show that adding a person is a request, not the end of it, which matches the message's second half: "ensure it is approved". Go back to the inspection request only once Status shows the staff as approved; if a Rejection Reason appears instead, fix what it names and add the person again.
Before you add anyone
- Use engineers the municipality already knows. The circular speaks of engineers "registered with the municipality", and the municipality's services list (read Nov 13, 2026) has a service of its own, Certificate of Accreditation of Engineering Staff, for registering in its Engineering Practice Register. An engineer who is not registered to the company there has nothing to be picked from in Add Staff.
- The consultant has the same screen. Consultant Technical Staff is the next link in the same column. If the contractor's staff are approved and the error stays, the consultant's side of the permit is the next thing to check, since the circular names both.
- It is per permit. The table has a Permit No column and the search is by project, permit or parcel, so staff approved on one permit do not carry to the company's next one.
- The inspection itself costs nothing in the usual case. The same services list says of Request Site Structural Inspection that building contractors request it through the municipality's website or Dubai BPS, and that it is free if no re-demarcation is needed.
What we checked
The six screens are captures of Nov 13, 2026 from a contracting company's own account, with the company's name, its permit and parcel numbers and its request references blanked out; the red labels and arrows were added to them. Every menu name, link name, button and column on this page is read from those captures. The circular was read in full the same day in the municipality's English translation, which says the Arabic text prevails. The two service descriptions come from the municipality's services list as it stood that day.
What we could not check: the form behind Add Staff is not in the captures, so this page does not describe its fields. Nothing we could read says who approves the staff (the project's consultant or the municipality) or how long approval takes, and the circular is silent on both. The service detail pages on hub.dm.gov.ae load only in a signed-in browser session and were not read. Our reading that the Contractor Engineer list is filled from the approved staff is an inference from the two screens, not a statement by Dubai Municipality.
Sources
- Circular No. (11-6-1) of 2021, The periodical inspection and reviewing of the building sites, Dubai Municipality, Aug 23, 2021, read Nov 13, 2026
- Dubai Municipality Services, Dubai Municipality, read Nov 13, 2026
- Dubai BPS (portal.dm.gov.ae) and the Dubai Municipality dashboard (hub.dm.gov.ae), six screens captured Nov 13, 2026
- How to login and check Dubai BPS system | Dubai Municipality for Building permit., EASYMASE CIVIL engg, Jan 29, 2026 (video)
- How to Apply for a Simple Modification | Dubai Municipality BPS Step by Step + All Application Types, EASYMASE CIVIL engg, Oct 19, 2026 (video)
Moments
How to login and check Dubai BPS system | Dubai Municipality for Building permit.
EASYMASE CIVIL engg
How to Apply for a Simple Modification | Dubai Municipality BPS Step by Step + All Application Types
EASYMASE CIVIL engg
Photos
See also
-
Dubai Property Block for Unpaid Service FeesWe rate this tip A tier: a Dubai property blocked over late service fees stays blocked after you pay, until you ask the management company to release it. How to check the status with the Dubai Land Department, and how to pay the exact amount owed.
-
DEWA Housing FeeWe rate this tip S tier: the Housing line on a DEWA bill is 5% of a rent figure that Dubai Municipality will correct on request. George Vanous's notes record three rounds of requests; one cut the fee on two villas by AED 1,075 a month each.
-
Filling a Pool in DubaiWe rate this tip S tier: filling a villa pool from the DEWA tap costs well under half of what tanker trucks charge. George Vanous paid AED 6,400 for trucks; the same 170 cubic meters from DEWA comes to about AED 2,645 at the Nov 2026 tariff.
-
Dubai Driving License Renewal After ExpiryWe rate this tip B tier: a Dubai license that expired under 10 years ago renews without a retest, and the late fine is AED 10 a month, capped at AED 500. George Vanous renewed one 33 months late in under 30 minutes for AED 835.
-
Dubai Property Purchase FeesWe rate this tip S tier: budget 6.4% on top of the price of a resale home in Dubai, not the 4% everyone quotes. George Vanous's notes list every check for an AED 4,000,000 apartment bought in cash, AED 4,255,080 in all.
-
Dubai Rent Increase LimitWe rate this tip S tier: at renewal a Dubai landlord may raise the rent by 0%, 5%, 10%, 15% or 20% at most, set by how far the rent sits below the Land Department's index, and only with 90 days of notice. A 20% demand on a rent 15% under the index is capped at 5%.